Phase of construction: commissioned and put into operation on 09.10.2015.
Time of construction: 06.2015 - 10.2015.
The design was elaborated in two phases. Detailed Technical Design (2012); and Detailed Work Design (2013), after the approval of the Detailed Technical Design.
The design comprises: modernization of the sport ground; construction of a running track; construction of a basketball playground; construction of a track for long jump; rehabilitation of the volleyball playground; rehabilitation of the benches at the stadium, the commenters’ post, the administrative building, the warehouse for sports equipment and materials and the restrooms for visitors;
New volleyball sport hall has been designed. The hall is equipped with HVAC system, lighting and visitors’ benches.
New open-work fence surrounding the whole complex has been designed. Parade main entrance for the complex has been designed also.