Reconstruction of the Municipal Road Network in Tran Municipality

  • Откриване на строителната площадка - 10.2014г.

 

The design was elaborated in a Technical Detailed Design phase.
Phase of construction: put into operation in August 2015.
Time of Construction: 09.2014 - 08.2015
The design comprises rehabilitation of the municipal roads networks, consisting of 8 roads with overall length of 19 km. The design stipulates the following construction works: re-asphalting of the asphalt pavement; re-lagging of the road shoulders; demolition of the old elastic fence and construction of a new one; construction of roadside ditches and drainage facilities; stabilization of the roadside slopes; construction of a whole new road marking and vertical signaling;
As a result of the execution of this project, the 8 roads have been rehabilitated, their technical and operational specifications have been improved, and their time of operation prolonged.

contentmap_plugin

© 2015 Infraconstruct. All rights reserved.

Please publish modules in offcanvas position.

CineCron

shopify stats

By visiting this website, you agree to our use of cookies to provide you with the best experience...